1900:
Placed set of rolls in Breaker to break down broken and egg coal.
Purchased Blake slush pump, 12” x 8” x 17.”
Trestle 40 feet high and 120 feet long built across Bear Creek to run cars with breaker rock to dumping ground.
December 20th, a 500 horsepower B & W boiler erected.
Purchased a Jeansville pump, 10” x 12” x 6.”
March 16th, No. 4 Slope flooded to a depth of 12 feet; idle 32 days.
Strike- 35 days, September 17 – October 29; 10% wage increase